Campus Projects
Project | Start | End | Summary | Status |
---|---|---|---|---|
Conference Room Updates | December 2024 |
March 2025
|
Three conference spaces in HSEB are being fully refreshed to account for new audio systems. New ceiling arrays will be installed, along with updated cameras and AVoIP hardware to support networked systems. |
Completed
|
BSPB 2nd Floor Buildout | March 2023 |
February 2025
|
BSPB 2nd floor built out to accommodate the CAMI lab. A new executive conference room and huddle space are being added to the lab. Both spaces will provide the ability to web conference and include USB-C connectivity for BYOD. |
Completed
|
Second Floor Study Room Repairs | November 2023 |
November 2023
|
The six second floor study rooms are being updated to include new video transmitters for Teams/Zoom conferencing. |
Completed
|
Lecture Hall Updates | May 2022 |
July 2023
|
HSEB B102 and B108 will be undergoing updates to include NVX standards. B108 will have Shure table microphones for student interaction during web/video conferencing and and added Doc Cam at the podium. |
Completed
|
A501 Upgrades | March 2023 |
June 2023
|
A501 has been upgraded to include a new touch panel and conferencing system. |
Completed
|
B210 Upgrades | April 2023 |
June 2023
|
B210 has been upgraded to have a new system and microphones. |
Completed
|
Pharmacy Lab Upgrade | April 2023 |
May 2023
|
C302 has been updated to include a new touch panel, microphones, and an instructors podium. |
Completed
|
Pharmacy Conference Room Upgrade | April 2022 |
April 2022
|
3271 has been updated to include a new Crestron touch panel and system for conferencing needs. |
Completed
|
BSPB 3rd & 4th floors | April 2021 |
December 2021
|
BSPB 3rd and 4th floors were completed. Each floor has a standard conference room and two huddle rooms. |
Completed
|
B555 Updates | April 2021 |
June 2021
|
B555 has been upgraded to include a new 4K display and Soundbar. |
Completed
|