BSPB 2nd Floor Buildout
March 24, 2023
BSPB 2nd floor built out to accommodate the CAMI lab. A new executive conference room and huddle space are being added to the lab. Both spaces will provide the ability to web conference and include USB-C connectivity for BYOD.