Campus Projects
Project | Start | End | Summary | Status |
---|---|---|---|---|
Sixth Floor Study Spaces | Monday, September 28, 2020 |
Friday, October 30, 2020
|
The sixth floor conference rooms have been updated to have new displays, USB-C and HDMI cable connections, and a control panel. These rooms also have an integrated soundbar, camera, and microphone solution for a more cohesive Zoom and Teams experience. (B602, B603, and B621) |
Completed
|
HSEB Classroom Upgrades | Monday, July 20, 2020 |
Wednesday, September 30, 2020
|
HSEB classrooms are being upgraded with laser projection and wireless presentation at the podium for instructors and speakers. An audience microphone solution for Teams and Zoom conferencing has been installed as well as USB-C and HDMI connections. (A446, B202, and C401) |
Completed
|
Clinical Skills Debriefing Spaces | Thursday, September 10, 2020 |
Tuesday, September 29, 2020
|
The Clinical Skills third floor debriefing spaces have been updated with new displays, USB-C and HDMI connections, and a control panel. (B310, B311, B321, B322, and B323) |
Completed
|
PBC Zoom Rooms | Sunday, January 5, 2020 |
Sunday, August 30, 2020
|
Eleven conference rooms have been upgraded to provide a native Zoom meeting experience. These rooms provide a built-in camera and microphone for conference needs, along with USB-C and HDMI cable connections. (HSEB 1st-6th floors, Building 1 1266) |
Completed
|
BSPB/HSEB Scheduling Panels | Sunday, March 1, 2020 |
Sunday, August 30, 2020
|
Over 40 different shared spaces will have a scheduling panel installed at the entrance. The panel is integrated with ASTRA scheduling to inform users of the room availability. (HSEB 1st-6th floors, BSPB 1st floor) |
Completed
|
Projector Screen Replacements | Sunday, January 5, 2020 |
Wednesday, July 8, 2020
|
The HSEB projector screens are being upgraded to account for laser projection. More than 20 screens are being upgraded to improve image quality. (HSEB 1st-4th floors) |
Completed
|
SIM Lab updates | Tuesday, January 28, 2020 |
Tuesday, June 2, 2020
|
The Simulation Center has been updated to mitigate audio latency between the live event and CAE Learning Space. We designed and installed a latency free communication system while also providing a high quality audio solution during live events. (HSEB 3rd and 4th floor) |
Completed
|